Air conditioning controller test
Solution: 6 station with a robot
Cycle time: 30 sec./pc
Main steps:
• Torque test
• Location distance test
• Operational tests
• Robot integration
• Electrical performance test
• Data collection
• On-site analysis
• Quality traceability