Automatic cabinet panel welding line
This cabinet panel welding line adopts Joint operation of robots to achieve Fully Automatic Welding Production Line.
work piece material: cold rolled steel SPCC
work piece specifications
I:side panel size range
A. Height: 1600~2500mm
B. Width: 600~1200mm
II.left front door, right front door size compatible range
A. Height: 1600~2500mm
B. Width: 300~600mm
III.back door panel size compatible range
A.Height: 1600~2500mm
B.Width:600~1200mm
work piece precision requirements
I.The length of the the reinforcing rib on the side guard panel shall be 4 mm smaller than the inner width of the side guard panel, and the tolerance shall be negative.
II.The flatness of the welding plane of the hinge and the lock bar positioning block shall not exceed 0.1 mm.
III.The welding plane burr height of the rib, hinge and lock bar positioning block shall not exceed 0.1mm
IV.The flatness of the side panel, all door panels and the rib shall not exceed 0.1mm/50cm2
Function requirements
V.Cycle time requirement: 2min/piece. Production line utilization rate of 90%
VI.The production line requires a high degree of automation. Except for the material handling personnel, the operator must not exceed one person.
VII.feeding mode
A.Side panel, left front panel, right front panel and back door panel all automatic feeding by AGV.
B.Manual feeding the rest of material.
VIII.The design of the logistics rack should consider minimizing scratching on the surface of the workpiece, and consider the versatility for handling different parts. The storage capacity of the logistics rack is 2 hours, that is, feeding every 2 hours.
IX.Discharging mode: conveyor
OP10 side panel and back door panel welding station.
Side panel welding process flow: The side panel is placed on the rack by AGV. The reinforcing ribs are assembled into an I-shaped shape at the assembly station by manual sorting. The transfer robot is equipped with a face and back double-side tooling. The face side tooling is double-layered and can realize grabbing job for the rib and side panel at the same time and place them on the single-axis positioner at the side of the 2-work-position turntable no. 1. After positioning and clamping, the turntable rotates and transfer the workpiece into the welding room. The welding robot configures the laser to complete the welding work. After the welding is completed, the turntable rotates and transfers the workpiece out of the welding room. And the welded side panel is grabbed by the two-axis truss and placed on the roller conveyor and sent out of the welding station.
Back door welding process flow: The back door panel is placed on the rack by AGV, and grabbed by the face side tooling of the transporting robot to the single-axis positioner by the side of the 2-work-position turntable no.2. The hinge hinge and the positioning block are fed to designated position through the vibrating plate. Two-axis truss carries the four-axis SCARA robot to position to grab and place the parts on the temporary storage trays one by one. The two-axis truss carries the four-axis SCARA robot and the temporary storage tray to the single-axis positioner by the side of the 2-work-position turntable. The 4-axis SCARA robot places the parts to position one by one from the temporary storage tray. After positioning and clamping, the turntable rotates the workpiece into the welding room. The welding robot configures the laser to complete the welding work. After the welding is completed, the turntable rotates the workpiece out of the welding room. The transporting robot transports the welding back door panel finished product to stud welding position. After the stud welding is completed, the welded workpiece is placed on the roller conveyor and sent out of the welding station.
OP20 left front door & right front door welding position
The left front door and the right front door uses two similar welding stations. The left front left door is placed on the rack by AGV, and is grabbed by face handling of the transportation robot to single-axis positioner by the side of a 2-postion turn table. The hinge hinge and positioning block are fed to the specified position through the vibrating plate. The two-axis truss carries the four-axis SCARA robot into position, and the parts are grabbed and placed on the temporary storage tray one by one. The two-axis truss carries the four-axis SCARA robot and the temporary storage tray to the single-axis positioner by the side of the 2-position turntable, and the four-axis SCARA robot puts the parts to place one by one from the temporary storage tray. After positioning and clamping, the turntable rotates the workpiece into the welding room. The welding robot configures the laser to complete the welding work. After the welding is completed, the turntable rotates the workpiece out of the welding room, and the welding robot grabs the welded door and place it to the stud welding station, and after the stud welding is completed, the welded workpiece is placed on the roller conveyor and moved out of the welding station.
Laser process testing station
The welding station of the laser process testing station is independent of the main welding room. It is a two-layer structure, the upper layer is used to place the laser, the chiller and the voltage regulator, the lower layer is the welding room. The KUKA welding robot is equipped with the laser welding system, and coordinates with a 2-axis positioner. The positioner is equipped with standard octagonal pore welding platform, and integrated rapid manual tooling.
cycle time analysis
Cycle time design requirement: 2min/piece
Automatic cabinet panel welding line equipment laout
|
Automatic cabinet panel welding line 3D schematic |
|
|
1.layout
This welding station system comprises two side panel racks, two back door panel racks, one rib loading unit, one set of transportation robot loading and unloading system, one set of hinge and positioning block loading system, one set of side panel and back door welding system, one set of automatic stud welding system, one set of conveyor line system, one set of safety fences and one set of electrical systems, the layout is shown as below:
Automatic cabinet panel welding line
Side panel and back door panel welding station schematic
The side panel and the back door panel are stacked structure, each workpiece is separated. There is no direct contact between the upper and lower layers. Total 25 layers. The reinforcing ribs are directly stacked on the rack, no need to worry about scratching.
The side panel and the back door are each configured with two racks for to be used in turn. The feeding method of the panel material rack is AGV feeding, and the feeding method of the reinforcing material rack is manual sorting.
3.reinforcing rib loading unit
The reinforcing ribs are manually sorted and assembled into an I-shape. Then the rib assembly is pushed into position by the cylinder to drive the slide rails, and then wait for the transporting robot to handle further. The assembly tooling is compatible with all product specifications, only requires manual adjustment when changing the specifications.
reinforcing rib loading unit |
|
KUKA KR150 R3100 prime |
|
hinge and positioning block loading system |
|
Automatic cabinet panel welding line
side panel and back door panel welding system |
|
1.layout
This welding station system includes two left front door panel racks, two right front door panel racks, one set of transporting robot loading and unloading system, one set of hinge and positioning block loading system, and one set of left front door right front door panels welding system, one set of automatic stud welding system, one set of conveyor line system, one set of safety fences and one set of electrical systems. Layout as below:
Automatic cabinet panel welding line left front door / right front door welding station |
|
KUKA robot, model KR150 R3100 prime |
|
hinge and positioning block loading sytem. |
|
Automatic cabinet panel side panel and back door panel welding system |
|
Welding robot model: KUKA KR60HA R2033, equipped with DKP400 2-axis positioner, linkage action. The standard octagonal pore welding platform and integrated manual quick change tooling are arranged on the 2-axis positioner.
KUKA KR60HA R2033 |
|
name
|
description
|
brand
|
unit
|
quantity
|
|
1
|
Side panel reinforcing rib loading unit
|
loading unit frame
|
JINGGONG ROBOTICS
|
SET
|
2
|
reinforcing rib positioning tooling
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
rod-less air cylinder
|
FESTO
|
SET
|
1
|
||
guide rail L=1250mm (including sliding block)
|
HIWIN
|
SET
|
2
|
||
safety fence
|
LOCAL
|
SET
|
1
|
||
2
|
Front door loading & unloading, stud welding and side panel unloading unit
|
loading rack
|
JINGGONG ROBOTICS
|
SET
|
4
|
Transporting robot KR150 R3100 prime
|
KUKA
|
SET
|
1
|
||
Transporting robot sliding rail 8m
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
Transportation robot base
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
Transporting tooling
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
Automatic stud welding system
|
HBS/OTHER
|
SET
|
1
|
||
Stud welding tooling
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
Big door panel roller line 1(L×W:8.5×1.5m)
|
MODULAR/OTHER
|
SET
|
1
|
||
Big door panel roller line 2(L×W:17×3m)
|
MODULAR/OTHER
|
SET
|
1
|
||
Jacking translating mechanism
|
MODULAR/OTHER
|
SET
|
3
|
||
Jacking mechanism
|
MODULAR/OTHER
|
SET
|
1
|
||
Side panel roller line (L×W:5.5×1.5m)
|
MODULAR/OTHER
|
SET
|
2
|
||
safety fence
|
LOCAL
|
SET
|
1
|
||
3
|
Hinge, positioning block loading and side panel unloading truss manipulator
|
gantry
|
LOCAL
|
SET
|
1
|
X axis servo motor (including drive)
|
SIEMENS/OTHER
|
SET
|
2
|
||
Z axis servo motor (including drive)
|
SIEMENS/OTHER
|
SET
|
2
|
||
Side panel unloading tooling
|
JINGGONG ROBOTICS
+OTHER
|
SET
|
1
|
||
Side panel unloading roller line (L×W:2.5×0.8m)
|
MODULAR/OTHER
|
SET
|
2
|
||
vibrating loading disc
|
BFC/OTHER
|
SET
|
2
|
||
loading positioning mechanism
|
JINGGONG ROBOTICS
|
SET
|
2
|
||
Loading robot G6 653SR
|
EPSON/OTHER
|
SET
|
1
|
||
SCARA robot tooling
|
JINGGONG ROBOTICS
+OTHER
|
SET
|
1
|
||
Work piece placing positioning tray (5-pieces)
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
4
|
Back door loading & unloading, stud welding unit
|
loading rack
|
JINGGONG ROBOTICS
|
SET
|
4
|
Transporting robot KR150 R3100 prime
|
KUKA
|
SET
|
1
|
||
Transporting robot sliding rail 8m
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
Transporting robot base
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
Transporting tooling
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
Automatic stud welding system
|
HBS/OTHER
|
SET
|
1
|
||
Stud welding tooling
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
Unloading roller line 1 (L×W:3×1.5m)
|
MODULAR/OTHER
|
SET
|
1
|
||
Unloading roller line 2(L×W:6×2.5m)
|
MODULAR/OTHER
|
SET
|
1
|
||
Jacking translating mechanism
|
MODULAR/OTHER
|
SET
|
2
|
||
Stairs and pedal
|
LOCAL
|
SET
|
2
|
||
Safety fence
|
LOCAL
|
SET
|
1
|
||
5
|
High, positioning block loading truss manipulator
|
gantry
|
LOCAL
|
SET
|
1
|
X axis servo motor (including drive)
|
SIEMENS/OTHER
|
SET
|
1
|
||
Z axis servo motor
|
SIEMENS/OTHER
|
SET
|
1
|
||
Vibrating loading disc
|
BFC/OTHER
|
SET
|
2
|
||
Loading positioning mechanism
|
JINGGONG ROBOTICS
|
SET
|
2
|
||
Loading robot G6 653SR
|
EPSON/OTHER
|
SET
|
1
|
||
SCARA robot tooling
|
JINGGONG ROBOTICS+OTHER
|
SET
|
1
|
||
Work piece placing positioning tray (8-piece)
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
6
|
Top and bottom panel fetching unit
|
Loading rack
|
JINGGONG ROBOTICS
|
SET
|
4
|
Loading robot KR120 R3200 PA
|
KUKA
|
SET
|
1
|
||
Transporting robot sliding rail 10m
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
Robot tooling
|
JINGGONG ROBOTICS+OTHER
|
SET
|
1
|
||
Safety fence
|
LOCAL
|
SET
|
1
|
||
7
|
Side panel, front door and back door panel welding unit
|
Welding robot KR120 R2700 extra HA
|
KUKA
|
SET
|
2
|
Welding robot base
|
JINGGONG ROBOTICS
|
SET
|
2
|
||
Welding robot sliding rail 10m
|
JINGGONG ROBOTICS
|
SET
|
2
|
||
2-position turntable AT1000
|
FIBRO
|
SET
|
4
|
||
2-position turntable servo drive
|
SEW
|
SET
|
4
|
||
2-position turntable base
|
FIBRO
|
SET
|
4
|
||
H type slewing frame
|
JINGGONG ROBOTICS
|
SET
|
4
|
||
Flexible tooling bottom plate (including quick-fix parts)
|
DING SHENG TIAN/OTHER
|
SET
|
8
|
||
Zero point positioning tooling
|
AMF/OTHER
|
SET
|
16
|
||
Single axis positioner (including reducer)
|
JINGGONG ROBOTICS
+SUMITOMO
|
SET
|
8
|
||
Single axis positioner servo motor
|
JINGGONG ROBOTICS
+OTHER
|
SET
|
8
|
||
Welding fixture
|
JINGGONG ROBOTICS
|
SET
|
8
|
||
Welding robot KR60 HA
|
KUKA
|
SET
|
1
|
||
2-axis positioner DKP400
|
KUKA
|
SET
|
|||
Welding robot base
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
2-axis positioner welding octagonal pore welding platform
|
LOCAL
|
SET
|
1
|
||
平面焊接孔隙平台2.4X1.2m
|
LOCAL
|
SET
|
2
|
||
Plane pore welding platform quick-set-up fixture
|
LOCAL
|
SET
|
1
|
||
Laser welding supporting system
|
TRUMPF
|
SET
|
1
|
||
Gun cleaner
|
TBI/OTHER
|
SET
|
1
|
||
8
|
Welding room unit
|
Bit welding room
|
JINGGONG ROBOTICS
|
SET
|
1
|
Double layer welding room
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
Safety fence
|
JINGGONG ROBOTICS
|
SET
|
1
|
||
AC
|
LOCAL
|
SET
|
1
|
||
Shutter door W=3m
|
LOCAL
|
SET
|
2
|
||
9
|
Dust removal system
|
Big welding room DFO 3-18
|
Donaldson/OTHER
|
SET
|
1
|
Small welding room DFO 2-2
|
Donaldson/OTHER
|
SET
|
1
|
||
10
|
Laser welding system
|
激光器:TruDisk 6001+1个振镜PFO33+1个PFO3D
|
TRUMPF
|
SET
|
1
|
Voltage regulator
|
TENGEN
|
SET
|
1
|
||
Chiller MCWL-250
|
TONGFEI
|
SET
|
1
|
||
11
|
Camera, screen & camera platform
|
|
JINGGONG ROBOTICS+LOCAL
|
SET
|
1
|
12
|
Electric control system
|
|
SIEMENS/OTHER
|
SET
|
1
|
13
|
Relative mechanical annex
|
|
JINGGONG ROBOTICS+LOCAL
|
SET
|
1
|
14
|
Relative mechanical annex
|
|
LOCAL
|
SET
|
1
|
automatic loading 4-axis SCARA robot :EPSON G6 653SR |
|
laser process testing station welding robot: KUKA robot KR60 HA R2033 |
|
laser welding system :TRUMPF laser TruDisk6001+1 galvanometer + 1 galvanometer PFO3D. |
The welding vibration lens can perfectly solve the problem of rapid laser welding in the working area, and the switching time between point and point, track and track can be less than 30 ms, which can greatly improve the welding cycle time. Through the corresponding professional software TRUMPF can set and optimize a lot of laser welding process parameters, and edit the required welding trajectory (welding points), when the need for flight welding can also match the robot action fitting programming to achieve flight welding. |
vibrating disc |
|
automatic stud welding system |
screw automatic feeding system fixed type stud welder |
Electric control system |
The control system uses SIEMENS PLC to collect signals such as sensors into the CPU through the network, and deliver the processed signals to the execution components through the network. Configuring electrical control cabinets and operating boxes Pneumatic components uses FESTO or SMC. System configured with mechanical button switch start. Operation has manual / automatic mode. Relative parameters can be set from HMI. Safety fence in place to ensure personnel safety. Floor: Cement floor, conventional workshop type. After the whole work station is leveled, it can be fixed to the ground by chemical bolts or expansion bolts; the bearing capacity of the ground is required to be <25KN/ m2 Temperature: 5~45℃ Humidity: 2075%RH Vibration: less than 0.5G Power: 380V±10%; 3 phase 5 wire, 50HZ±2% |